摘要 |
Through the demand analysis of emergency power supply construction, waterfall noise reduction treatment, and utilization of residual pressure resources, combined with water resources and industrial infrastructure conditions, this paper proposes the significance of micro hydropower station construction. However, micro hydropower stations face issues such as insufficient construction standardization, prominent safety hazards, lack of specialized standards, and the need for improved planning and design. Therefore, this paper analyzes and discusses the constraints and improvement summaries in the entire construction process of micro hydropower stations from aspects including guidance of standard formulation, rationality of planning and design, and innovation of new product applications. |